201 Friesian Way
Vernon & Philippa Goodwin · Hogansville, GA 30230
Walk together. Mark every concern.
Buyers, builder and agent: review the inspection items, mark needed work and add new findings. Agree on who will complete each repair and when.
Your notes save in this browser on this device when supported. Your phone and the buyers’ phones do not automatically sync. Use Save filled HTML copy to pass along a copy with your current notes.
Meeting details & instructions›
Review all 17 inspection items plus every additional marked repair. “Reviewed today” does not mean repaired. At the final visit next week before closing, recheck work and record anything still open.
Source: RIA inspection, Jason Chesnut, September 15, 2026. Images match the report’s item numbers. HVAC servicing and general cosmetic repairs have no item-specific photo.Inspection summary · 17 items
Additional marked repairs
Add paint, trim, flooring, cabinets, doors or anything else found today. Include the exact location and tape / photo number.
Whole-house check
Mark areas reviewed today. Log any work needed above.
Before leaving today
Final visit · before closing
Other inspection follow-up›
Electrical panel (p. 19): Access was obstructed and the panel was not inspected. Clear access and arrange appropriate inspection / verification.
Heating mode (p. 16): Not tested. Ask the HVAC contractor about appropriate operating verification.
Disposal (p. 26): Listed as not installed / not available for testing. Confirm inclusion and operation once installed.
Sprinkler system (p. 22): Not tested. Request a demonstration and instructions.
Keep or share your record
A filled HTML copy includes the photos and current notes. Share that file yourself. Each person edits their own copy; changes are not merged automatically. Back up before switching browsers or devices.